A major contract with Wembley resulted in a laundry company needing to rethink their logistics situation. With their factory having no dedicated loading or unloading facility a Chase modular dock scheme offers the perfect solution. The scheme includes 2 dock levellers and a scissor lift catering for different sizes and types of vehicles. The goods can be pre-marshalled next to the levellers or lift and then safely transferred to ground level to be moved into the factory. The scheme is non-permanent and as such can be added to or removed (at the end of a lease for example).
WHITBREAD SLEEP EASY WITH CHASE
Although concrete docks were originally chosen to convert the selected 2,000 sq.metre site of Whitbread's Premier Travel Inn distribution centre, Chase Equipment's Modular Docking System proved a better and more flexible solution.
Chase Equipment recently delivered a special 17t ramp to a customer
to allow them to drive trucks onto low loaders. The specially designed
one-off was needed to a tight deadline due to a new contract starting,
the customer had also arranged for a training course in how to
use the ramp with 30 people in attendance.
The ramp arrived at the customer on the morning of the training,
as agreed, and the customer is extremely happy with our response,
attention & service.
SCISSOR LIFT SOLUTION SOLVES PROBLEM FOR CUSTOMER
A Friday afternoon call from a potential customer with a real
problem. Having designed a 1st floor showroom for his car dealership,
he urgently needed a way of getting vehicles safely into the showroom!
By the end of play, and several e-mails & phone calls later,
an order for a scissor lift was placed.
On the agreed date the lift was commissioned & installed.
The lift incorporated handrails and gates to fit in with the existing
architectural hardware painted to match. The customer was delighted
with the final product... Problem solved.
MODULAR DOCK INSTALLATION MOVED BY CHASE
A national distribution customer had been using a modular dock
installed by Chase Equipment some 10 years ago. Due to consolidation
of activities and the subsequent closure of the site, there was
a need to dismantle and re-assemble the dock scheme at a new site,
and incorporate some new features.
The Chase service team carried out this work, with minimum inconvenience
to the customer and with the dock scheme now in operation at the
new site, the customer can expect many more years of service.